Perth Tunnel, WA Australia


Perth Tunnel

2006 - 2007

Client: Leighton Kumagai Joint Venture

Project: New Metro Rail Project

Job: William Street Grout Compensation Scheme

During the grout compensation scheme, undertaken to protect the Walsh Building and Goldgroup Building in the Perth CBD, ITM-Soil provided a monitoring system to aid the control of the jet grouting. ITM-Soil's unique cable free Electrolevel Beams allowed the contractor to efficiently and unobtrusively install and monitor the buildings with great accuraccy. ITM-Soil's I-Site data presentation package was used to closely monitor the movements.

ITM-Soil provides: