2008 - 2009
Client: MPDJV
Project: RGP4 Newman Hub
Job: TLO Load Monitoring
As part of the Rapid Growth Project 4 (RGP4), a dual trail load out structure and stockpile were constructed in the Newman Hub, by the Mount Whaleback ore body. In order to gain the neccessary information to reduce conservatism in future designs, MPD JV commissioned ITM-Soil to oversee the installation of 105 vibrating wire oil filled pressure cells on the walls and roof of the structure. The sensors are queried every hour, and each day the data is transferred via FTP to the head offices in Perth.
ITM-Soil provides: